A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is audit pipeline.
Repair the audit pipeline capacity pool implementation so it allocates limited capacity by priority without exceeding demand or the global limit.
Evidence
- Affected surface: Full-stack backend focus / audit pipeline.
- Observed failure family: allocate limited capacity.
- Scope policy: contractVersion must equal 2.