A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is collaboration flow.
Repair the collaboration flow capacity pool implementation so it allocates limited capacity by priority without exceeding demand or the global limit.
Evidence
- Affected surface: Balanced full-stack / collaboration flow.
- Observed failure family: allocate limited capacity.
- Scope policy: retained must equal true.