A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is collaboration flow.
Repair the collaboration flow cache lifecycle implementation so it separates purge, refresh, and escalation actions by staleness and risk.
Evidence
- Affected surface: Balanced full-stack / collaboration flow.
- Observed failure family: plan cache invalidation.
- Scope policy: retained must equal true.