A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is notification center.
Repair the notification center dependency protection implementation so it opens only after the failure threshold and calculates a deterministic retry time.
Evidence
- Affected surface: Balanced full-stack / notification center.
- Observed failure family: calculate circuit-breaker state.
- Scope policy: cohort must equal stable.