A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is event pipeline.
Repair the event pipeline capacity pool implementation so it allocates limited capacity by priority without exceeding demand or the global limit.
Evidence
- Affected surface: Cloud-native full-stack / event pipeline.
- Observed failure family: allocate limited capacity.
- Scope policy: region must equal eu-west.