A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is checkout flow.
Repair the checkout flow dependent jobs implementation so it produces a deterministic dependency order and reports blocked cyclic work.
Evidence
- Affected surface: Full-stack frontend focus / checkout flow.
- Observed failure family: order dependent work.
- Scope policy: cohort must equal stable.