A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is upload pipeline.
Repair the upload pipeline dependency calls implementation so it retries transient failures with bounded exponential delays and stops permanent failures.
Evidence
- Affected surface: Full-stack frontend focus / upload pipeline.
- Observed failure family: plan bounded retries.
- Scope policy: qualityState must equal verified.