A production rollout exposes a contract mismatch between the UI boundary and the owning service. The affected area is upload pipeline.
Repair the upload pipeline lifecycle transitions implementation so it accepts only declared state transitions and reports rejected requests.
Evidence
- Affected surface: Full-stack frontend focus / upload pipeline.
- Observed failure family: validate state transitions.
- Scope policy: qualityState must equal verified.