A production request path returns inconsistent decisions during retries and concurrent updates. The affected area is scheduled job.
Repair the scheduled job state synchronization implementation so it accepts compatible server updates and surfaces version conflicts without losing local intent.
Evidence
- Affected surface: Spring / scheduled job.
- Observed failure family: reconcile optimistic state.
- Scope policy: qualityState must equal verified.